Home » RAILWAYS : POWER AND TRAFFIC BLOCK BETWEEN BASUKINATH AND DUMKA SECTION
Railways

RAILWAYS : POWER AND TRAFFIC BLOCK BETWEEN BASUKINATH AND DUMKA SECTION

TTT NEWS NETWORK

KOLKATA, 1 JANUARY 2024:

Power and traffic block will be required for 01 day for launching of RCC Boxes in Limited Height Subway-18(LHS-18) Between Basukinath  and Dumka Section of Asansol Division from 09.00 hrs. to 16.00 hrs.  on 03.01.2024 (Wedneday).

 Consequently,

Diversion of Trains:

03781 Dumka –Jasidih DEMU Special will run via Hansdiha- Mohanpur to Jasidih on 03.01.2024.

03784  Jasidih – Dumka DEMU Special will be run via Mohanpur-Hansdiha to Dumka on 03.01.2024.

Rescheduling of Trains:

03081 Rampurhat – Jasidih Express Special will be rescheduled by 120 minutes from Rampurhat on 03.01.2024.

Advertisement:

ALPS TOURIST SERVICES PVT LIMITED
ALPS TOURIST SERVICES PVT LIMITED

Currency Converter